The flat roof has been cut and the construction of roof details can commence any time.
The gaping window holes have also been filled. The window frames were drawn in OpenOffice Draw and printed on transparent self-adhesive labels. Each frame has been done in two copies -one for the outside and one for the inside of the building. The frames were stuck to a sheet of clear plastic before glued in place. The are slightly opaque but less than shown on the photos. The front windows still need some panels and posts, before they are finished.