The balustrades are up. They were easy to assemble with some tight fits on top of the columns. The roof area of the Bank is finished – at least for the time being.
My focus will now be drawn to street level. The two shops to the right of the stairs have to be finished. Canopies along Main Street and The Golden Mile are also on the drawing board.