After a holiday away from Wombat Creek I have worked on the trackbed for the final part of Wombat Creek Tramways – the big loop around the Big Nugget Mine. The sloping trackbed to the left of the loop leads down to the Explosives Factory in the background. I will need to test the trams on the slope to determine, how steep it will be. Because part of the ‘mine line’ (see Wombat Creek Consolidated Mines Pty Ltd) will pass under the tramway, track laying will commence after tracks for the before mentioned line are in place.
The trackbed for the mine loop
Text & photos from Wombat Creek Tramways Posted on Sat, April 30, 2022 16:10:34- Comments(0) https://wct.payne-ellef.dk/?p=412
- Share