The whole area around the explosives factory, the sawmill and the loco shed has been raised 6 mm to get above the surface of the creek. As seen on the photos the factory has been set into the ground to partly cover up it’s very high concrete foundation.
The track plan has the three points joining each other, but as can be seen from the first photo the track will hit the corner of the factory. Moving the points away from the factory will clear the corner but leave a too short shunt in front of the sawmill. Instead the first and second points will be separated by a slight curve as seen in the second photo.