Construction is well under way with most of the walls up. The radius of the curved walls is rather small (20 mm). To make sure the curves will be smooth once the bricks come up, small vertical cuts have been made for every 2 mm on the outside.
The Bellcord – part 2
Text & photos from Wombat Creek Tramways Posted on Mon, March 06, 2023 17:56:39- Comments(0) https://wct.payne-ellef.dk/?p=600
- Share