After more than 6 years of the work, today was the day to finally lay the last piece of track and the tramways would be fully operationally. The last track was bought Friday and today was the day! The section will be a tram stop and needs to be isolated with two plastic joiners. Here comes the catch! I was left with only one isolated joiner!
I will be off to the nearest model railway shop very soon!