wct 220701a

Three days work and the control panel for the tramways is almost finished. Only the loop around the Big Nugget Mine is missing. The final position of the tracks has to be determined depending on the design of the bridge over the narrow gauge railway.

Obviously the black lines are the tracks. The red push buttons control the points. Some points are still not connected. The black push buttons control the power to the tram-stops. The tracks are under constant power and the trams will come to a stop, unless the black buttons are activated. The slide switches are normally on, but they make it possible to stop a tram between stops.