wct 250920a

The work at Gumnut Gully Station continues. The platforms are covered in sand (from the local beach!). A load of timber is ready to be loaded on the wagon. Unfortunately the crane is still missing a chain for its hook.

The ‘Platform Signage’ from Peco contains the sign ‘Parcel Office’. As a consequence Gumnut Gully will get a standard 15′ x 12′ goods shed from the Victorian Railways.

goods shed