Construction is well under way with most of the walls up. The radius of the curved walls is rather small (20 mm). To make sure the curves will be smooth once the bricks come up, small vertical cuts have been made for every 2 mm on the outside.
The Bellcord – part 2
Text & photos from Wombat Creek Tramways Posted on Mon, March 06, 2023 17:56:39- Comments(0) https://wct.payne-ellef.dk/?p=600
- Share
The Bellcord – part 1
Text & photos from Wombat Creek Tramways Posted on Thu, February 23, 2023 17:27:17The construction of the Bellcord (the jazz club) has commenced. The concrete slab (foundation) has be poured (read: cut out of 1.5 mm cardboard). This allows me to see how it fits in on the corner next to the Fire Station and the future Comedy Theatre.
- Comments(0) https://wct.payne-ellef.dk/?p=597
- Share
New wagons
Text and photos from Wombat Creek Consolidated Mines Pty Ltd Posted on Thu, February 23, 2023 17:19:13Two more wagons have arrived at the narrow gauge railway. They stand out with their European look. But they were cheap! $8.50 for the two of them!
Only a joint in the middle of the floor reveals they are shortened versions of a general Liliput open wagon. From a side-on view the shortening is not visible. The wagons will be put into service as they are, but at a later stage they will be rebuilt.
- Comments(0) https://wct.payne-ellef.dk/?p=594
- Share
NQR wagons ready for service
Text and photos from Wombat Creek Consolidated Mines Pty Ltd Posted on Thu, February 16, 2023 17:43:07The four open NQR wagons have been finished. The colour is very close to the colour used at the Victorian Railways’ narrow gauge railways. The numbers are 21 – 24, with the 10’s reserved for covered wagons (only the powder wagon is planned at the moment). The one digit numbers will be used for carriages and brake vans.
The wagons are rather light and prone to derailments. I have cut some steel to add as weight. This makes the wagons far more stable but unfortunately too heavy for the locomotives to pull. I will reduce the steel and load the wagons with firewood and other mining necessities.
- Comments(0) https://wct.payne-ellef.dk/?p=592
- Share
A Mock-up of the Jazz Club
Text & photos from Wombat Creek Tramways Posted on Thu, February 09, 2023 17:43:48To get an idea of how the ‘Bellcord’ will fit in on the corner of the Golden Mile and the Main Street, I have printed a photo of the the original building in the approximate scale. It looks a bit flat and the hight probably needs to be increased to correspond with the fire station. ‘The Golden Sea Gull’ on the front will of course not be part of the model.
- Comments(0) https://wct.payne-ellef.dk/?p=589
- Share
Back in service
Text and photos from Wombat Creek Consolidated Mines Pty Ltd Posted on Thu, February 02, 2023 17:28:09The narrow gauge mining railway is up and running again. As mentioned in an earlier post, the original siding at the Big Nugget Mine wasn’t long enough for three wagons.
By moving the points into the siding closer to the entry points the siding can take three wagons. Now it is possible to shunt two loaded wagons and a brake van for two empties and the same brake van.
- Comments(0) https://wct.payne-ellef.dk/?p=587
- Share
Made an ‘Inglenook’ shunting puzzle by mistake.
Text and photos from Wombat Creek Consolidated Mines Pty Ltd Posted on Sun, January 29, 2023 17:55:28In 1899 the Victorian Railways began constructing rolling stock for their narrow gauge railways. It was decided all carriages and wagons should have the exact same dimensions. All are 27′ 3 ¾” long and 6′ 3” wide with 17′ between the bogies.
With this in mind I designed the track plan for the mining railway in Wombat Creek. The area with the Big Nugget Mine is rather constrained but calculations showed the loop should just be long enough for three wagons. Unfortunately the couplers are longer than expected. Only two wagons will allow the locomotive to run around. The ‘standard’ train will consist of one or two wagons plus a brake/guards van. A shunting puzzle has been created.
Shunting to and from the siding can be done, if the siding can take three wagons. Again, the couplers are just too long! Somehow the siding has to be extended, which can only happen by moving the points into the siding closer to the entry points.
After I have pulled up the tracks involved, I did some ‘line drawing’ and I have a new track plan for the mine. Exchanging two wagons already in the siding with two other wagons will be a challenge but can be done.
- Comments(0) https://wct.payne-ellef.dk/?p=584
- Share
A ‘rookie’ mistake
Text and photos from Wombat Creek Consolidated Mines Pty Ltd Posted on Wed, January 25, 2023 15:34:57The inaugural four NQR wagon train passing the Explosives Factory bound for the Big Nugget Mine.
Hang on! The loop can only take three wagons!
Time to fire up the small 6-wheeler for the rescue.
The 6-wheeler has arrived and will take the wagons back to the depot area.
The train has arrived. Later the big locomotive will come back as a light engine.
- Comments(0) https://wct.payne-ellef.dk/?p=582
- Share