The back of the Bank will not be visible once the building is in its final position in Wombat Creek, but I still want it to appear as well done as possible. At least I know it is done right!

For the time being bits and pieces are sticking out at the ends of the wall because I don’t know, how wide the adjoining buildings will be. Part of the wall features may be extended to the two walls at the end of the building.

wct 200915
The back of the Bank

The construction will continue with the flat roof, which will be detachable. That will give me access to the interior of the building, which will be visible through the front entrance. Window frames are also high on the agenda.