Part of The Mining Railway is up and running! The control panel (version 2. Version 1 was relocated to the bin) is in place and wired to the tracks around the explosives factory, sawmill and goods shed.
The entire fleet of locomotives, carriages and wagons has tested the tracks without issues apart from some bad connections in a couple of the points. The turntable is still missing making shunting quite difficult.
The temporay buffer stop is to prevent the trains from doing a major drop to the floor!