Part of The Mining Railway is up and running! The control panel (version 2. Version 1 was relocated to the bin) is in place and wired to the tracks around the explosives factory, sawmill and goods shed.

wct 220709a
Control panel for the Mining Railway

The entire fleet of locomotives, carriages and wagons has tested the tracks without issues apart from some bad connections in a couple of the points. The turntable is still missing making shunting quite difficult.

wct 220709b
Goods shed
wct 220709c

The temporay buffer stop is to prevent the trains from doing a major drop to the floor!