wct 230123a

The first open NQR wagon is ready to run. It still needs to be painted and and have a few details added. The body is made from 0.5 mm polystyrene sheets and 1.5 mm polystyrene angles. With another three wagons the fleet of NQRs should be big enough to serve the sawmill and mines