wct 230125b

The narrow gauge mining railway is up and running again. As mentioned in an earlier post, the original siding at the Big Nugget Mine wasn’t long enough for three wagons.

wct 230101

By moving the points into the siding closer to the entry points the siding can take three wagons. Now it is possible to shunt two loaded wagons and a brake van for two empties and the same brake van.