From the outset the narrow gauge railway was planned to just serve the goldmines with timber and explosives. Apart from miners no regular passenger traffic was expected. With the the line extended to Gumnut Gully regular passenger traffic became a reality. Gumnut Gully is rather isolated with poor roads into Wombat Creek and the rest of Victoria. The train is a far better option.
Regular passenger traffic requires a proper station in Gumnut Gully. The building is already up and the two platforms are under construction. At the end of the main platform timber can be loaded onto wagons. If loading is taking place, arriving passenger trains will use a narrow platform along track 2.
The station building is rather small and without public toilets. A separate toilet building will be erected at the platform. Victorian Railways have supplied the drawings. Please note, the drawings are dated four years into the future.


