Saturday 30 May 2020 is a day to remember in Wombat Creek. The tracks on the new extension have been laid (and re-laid due to a curve being too tight) and wired. The circle line is now fully operational with up to three trams running at the same time.
The photo shows the single line along Lt. Church Street. The line was planned to run in front of the church, but resulted in a curve in Church Street being too tight. The curve was eased but one of my three identical (?) still derails negotiating the curve. A problem to solve at a later state.
The shop fronts are mock-ups of real shops from the streets of Melbourne. They have just been printed and glued to cardboard to give me an idea, how they fit in. Before a final print each shop front has to go through Photoshop to get rid of electric wires and poles in front of the shops.
The control panel for the extension is a temporary fixture made from a take-away container! The tracks are still the original lay-out. The two unused holes are for the now re-positioned points into Little Church Street.